Multiple buses detoured as Granville Bridge remains blocked by demonstrators

Feb 12 2020, 11:53 pm

UPDATE: 

The bridge has now reopened in both directions.

ORIGINAL STORY:

The Granville Street Bridge remains blocked by demonstrators hours after a march began through downtown Vancouver in solidarity with Wet’suwet’en.

The bridge is blocked in both directions as demonstrators line the bridge on either side, causing major traffic delays.

While no cars are able to gain access to the Granville Street Bridge, the alternative option of the Burrard Bridge remains slow.

Translink has taken to Twitter to share the multiple bus detours put in place because of the blockade.

Rumneek JohalRumneek Johal

+ News