Channels
× Select City
×
×
×
News

Burrard Bridge road closures for structural repairs: begins February 3

D8d194f40cb13417f79d4d8daee34fdb?s=96&d=mm&r=g
DH Vancouver Staff Feb 02, 2014 9:15 pm

The 81-year-old Burrard Bridge will undergo safety and structural repairs starting Monday, February 3.

To ensure the bridge remains safe and in a state of good repair for many years to come, the City of Vancouver will replace 27 bearings and 19 expansion joints, and will perform concrete repairs and a deck inspection over the next five months.

There will be traffic impacts beginning at 5:00 a.m. on Monday, February 3:

  • Lanes will be reduced from five vehicle lanes to four
  • Two lanes in each direction will be operational

From March to July 2014, the bridge will operate with one vehicle lane southbound and two vehicle lanes northbound. Full access for cyclists and pedestrians will be maintained.

If you drive, consider alternate routes such as the Granville Bridge, which has eight lanes.

Image:  original_MikZ

Dh newsletter logo

Get direct access to our top weekly content, contests, and perks.


D8d194f40cb13417f79d4d8daee34fdb?s=96&d=mm&r=g
DH Vancouver Staff
Daily Hive is the evolution of Vancity Buzz, established in Vancouver in 2008. In 2016, the publication rebranded and opened newsrooms in Calgary, Toronto, and Montreal. Send story tips to [email protected]

© 2018 Buzz Connected Media Inc.